Electrical and Electronics Drafters
Prepare wiring diagrams, circuit board assembly diagrams, and layout drawings used for the manufacture, installation, or repair of electrical equipment.
- Tasks
- 30 tasks17 core, 10 supplemental, 3 not rated
- Family
- Architecture & EngineeringOne of its 59 occupations
- Code
- 17-3012.00SOC 2018: 17-3012
What the work is made of
17 core tasks, 10 supplemental and 3 not rated, each quoted as published, with where it came from.
Core: central to the jobSupplemental: done by some, not allNot rated: O*NET has not rated it core or supplemental
- Task 1. Draft detail and assembly drawings of design components, circuitry or printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices.Core taskTask 21951Rated by 59 people who do the job, August 2022
- Task 2. Draft working drawings, wiring diagrams, wiring connection specifications, or cross-sections of underground cables, as required for instructions to installation crew.Core taskTask 21945Rated by 142 people who do the job, August 2022
- Task 3. Assemble documentation packages and produce drawing sets to be checked by an engineer or an architect.Core taskTask 21946Rated by 141 people who do the job, August 2022
- Task 4. Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations.Core taskTask 21948Rated by 141 people who do the job, August 2022
- Task 5. Consult with engineers to discuss or interpret design concepts, or determine requirements of detailed working drawings.Core taskTask 21947Rated by 59 people who do the job, August 2022
- Task 6. Confer with engineering staff and other personnel to resolve problems.Core taskTask 21950Rated by 144 people who do the job, August 2022
- Task 7. Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable.Core taskTask 21952Rated by 142 people who do the job, August 2022
- Task 8. Design electrical systems, such as lighting systems.Core taskTask 21954Rated by 142 people who do the job, August 2022
- Task 9. Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions.Core taskTask 21955Rated by 140 people who do the job, August 2022
- Task 10. Review work orders or procedural manuals and confer with vendors or design staff to resolve problems or modify design.Core taskTask 21958Rated by 59 people who do the job, August 2022
- Task 11. Locate files relating to specified design project in database library, load program into computer, and record completed job data.Core taskTask 21953Rated by 58 people who do the job, August 2022
- Task 12. Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, or tolerances.Core taskTask 21949Rated by 59 people who do the job, August 2022
- Task 13. Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, or modify element.Core taskTask 21963Rated by 59 people who do the job, August 2022
- Task 14. Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, or conductor paths.Core taskTask 21965Rated by 59 people who do the job, August 2022
- Task 15. Study work order requests to determine type of service, such as lighting or power, demanded by installation.Core taskTask 21956Rated by 143 people who do the job, August 2022
- Task 16. Explain drawings to production or construction teams and provide adjustments, as necessary.Core taskTask 21957Rated by 141 people who do the job, August 2022
- Task 17. Reproduce working drawings on copy machines or trace drawings in ink.Core taskTask 21959Rated by 140 people who do the job, August 2022
- Task 18. Generate computer tapes of final layout design to produce layered photo masks or photo plotting design onto film.Supplemental taskTask 21960Rated by 59 people who do the job, August 2022
- Task 19. Determine the order of work and the method of presentation, such as orthographic or isometric drawing.Supplemental taskTask 21964Rated by 138 people who do the job, August 2022
- Task 20. Visit proposed installation sites and draw rough sketches of location.Supplemental taskTask 21966Rated by 140 people who do the job, August 2022
- Task 21. Key and program specified commands and engineering specifications into computer system to change functions and test final layout.Supplemental taskTask 21961Rated by 59 people who do the job, August 2022
- Task 22. Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure.Supplemental taskTask 21970Rated by 58 people who do the job, August 2022
- Task 23. Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department.Supplemental taskTask 21967Rated by 59 people who do the job, August 2022
- Task 24. Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames.Supplemental taskTask 21968Rated by 58 people who do the job, August 2022
- Task 25. Write technical reports and draw charts that display statistics and data.Supplemental taskTask 21969Rated by 140 people who do the job, August 2022
- Task 26. Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, or testing printed circuit boards.Supplemental taskTask 21962Rated by 59 people who do the job, August 2022
- Task 27. Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, or interconnection diagrams.Supplemental taskTask 21971Rated by 59 people who do the job, August 2022
- Task 28. Prepare and interpret specifications, calculating weights, volumes, or stress factors.Not ratedTask 21972Listed by O*NET analysts, November 2020
- Task 29. Supervise or train other technologists, technicians, or drafters.Not ratedTask 21973Listed by O*NET analysts, November 2020
- Task 30. Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, or traditional drafting tools, such as boards, pencils, protractors, or T-squares.Not ratedTask 21974Listed by O*NET analysts, November 2020
Where this comes from
Quoted from the U.S. Department of Labor, and credited. Nothing on this page is written by us.
How we copy and credit sources- Published byO*NET 29.0, U.S. Department of LaborEmployment and Training Administration
- ClassificationStandard Occupational Classification 2018, 17-3012
- LicenseCC BY 4.0Free to copy and reuse, with credit
- Changed by usNothing.
More in Architecture & Engineering
58 other occupations in this family, each with its own page.
- Aerospace Engineering and Operations Technologists and Technicians11 tasks
- Aerospace Engineers16 tasks
- Agricultural Engineers14 tasks
- Architects, Except Landscape and Naval24 tasks
- Architectural and Civil Drafters28 tasks
- Automotive Engineering Technicians18 tasks
- Automotive Engineers25 tasks
- Bioengineers and Biomedical Engineers30 tasks
- Calibration Technologists and Technicians15 tasks
- Cartographers and Photogrammetrists14 tasks
- Chemical Engineers13 tasks
- Civil Engineering Technologists and Technicians14 tasks
- Civil Engineers16 tasks
- Computer Hardware Engineers18 tasks
- Drafters, All OtherNo tasks listed
- Electrical and Electronic Engineering Technologists and Technicians30 tasks
- Electrical Engineers22 tasks
- Electro-Mechanical and Mechatronics Technologists and Technicians28 tasks
- Electronics Engineers, Except Computer20 tasks
- Energy Engineers, Except Wind and Solar21 tasks
- Engineering Technologists and Technicians, Except Drafters, All OtherNo tasks listed
- Engineers, All OtherNo tasks listed
- Environmental Engineering Technologists and Technicians26 tasks
- Environmental Engineers29 tasks
- Fire-Prevention and Protection Engineers13 tasks
- Fuel Cell Engineers26 tasks
- Geodetic Surveyors16 tasks
- Health and Safety Engineers, Except Mining Safety Engineers and Inspectors27 tasks
- Human Factors Engineers and Ergonomists26 tasks
- Industrial Engineering Technologists and Technicians30 tasks
- Industrial Engineers20 tasks
- Landscape Architects19 tasks
- Manufacturing Engineers24 tasks
- Marine Engineers and Naval Architects30 tasks
- Materials Engineers21 tasks
- Mechanical Drafters15 tasks
- Mechanical Engineering Technologists and Technicians30 tasks
- Mechanical Engineers28 tasks
- Mechatronics Engineers23 tasks
- Microsystems Engineers31 tasks
- Mining and Geological Engineers, Including Mining Safety Engineers18 tasks
- Nanosystems Engineers25 tasks
- Nanotechnology Engineering Technologists and Technicians25 tasks
- Non-Destructive Testing Specialists16 tasks
- Nuclear Engineers20 tasks
- Petroleum Engineers23 tasks
- Photonics Engineers26 tasks
- Photonics Technicians24 tasks
- Radio Frequency Identification Device Specialists21 tasks
- Robotics Engineers24 tasks
- Robotics Technicians22 tasks
- Solar Energy Systems Engineers13 tasks
- Surveying and Mapping Technicians30 tasks
- Surveyors24 tasks
- Transportation Engineers26 tasks
- Validation Engineers21 tasks
- Water/Wastewater Engineers28 tasks
- Wind Energy Engineers16 tasks
Use this record
Every task on this page is free to reuse, with credit to O*NET. The code and data behind the record are public.
Partner with us
Fund the next pass, contribute data, or build on the record. Tell us what you have in mind.
Partner with us