Org.AI Foundation Partner

Industrial Engineers

Design, develop, test, and evaluate integrated systems for managing industrial production processes, including human work factors, quality control, inventory control, logistics and material flow, cost analysis, and production coordination.

Tasks
20 tasks18 core, 2 supplemental
Family
Architecture & EngineeringOne of its 59 occupations
Code
17-2112.00SOC 2018: 17-2112

Read the 20 tasks Download this record as JSON

What the work is made of

18 core tasks and 2 supplemental, each quoted as published, with the survey it came from.

Show

Core: central to the jobSupplemental: done by some, not all

  1. Task 1. Estimate production costs, cost saving methods, and the effects of product design changes on expenditures for management review, action, and control.Core taskTask 18607Rated by 84 people who do the job, August 2020
  2. Task 2. Plan and establish sequence of operations to fabricate and assemble parts or products and to promote efficient utilization.Core taskTask 1394Rated by 84 people who do the job, August 2020
  3. Task 3. Analyze statistical data and product specifications to determine standards and establish quality and reliability objectives of finished product.Core taskTask 1391Rated by 84 people who do the job, August 2020
  4. Task 4. Confer with clients, vendors, staff, and management personnel regarding purchases, product and production specifications, manufacturing capabilities, or project status.Core taskTask 18609Rated by 84 people who do the job, August 2020
  5. Task 5. Communicate with management and user personnel to develop production and design standards.Core taskTask 1400Rated by 84 people who do the job, August 2020
  6. Task 6. Evaluate precision and accuracy of production and testing equipment and engineering drawings to formulate corrective action plan.Core taskTask 1407Rated by 84 people who do the job, August 2020
  7. Task 7. Recommend methods for improving utilization of personnel, material, and utilities.Core taskTask 1393Rated by 84 people who do the job, August 2020
  8. Task 8. Record or oversee recording of information to ensure currency of engineering drawings and documentation of production problems.Core taskTask 1403Rated by 84 people who do the job, August 2020
  9. Task 9. Draft and design layout of equipment, materials, and workspace to illustrate maximum efficiency using drafting tools and computer.Core taskTask 1398Rated by 84 people who do the job, August 2020
  10. Task 10. Direct workers engaged in product measurement, inspection, and testing activities to ensure quality control and reliability.Core taskTask 1405Rated by 84 people who do the job, August 2020
  11. Task 11. Develop manufacturing methods, labor utilization standards, and cost analysis systems to promote efficient staff and facility utilization.Core taskTask 1392Rated by 84 people who do the job, August 2020
  12. Task 12. Review production schedules, engineering specifications, orders, and related information to obtain knowledge of manufacturing methods, procedures, and activities.Core taskTask 1399Rated by 84 people who do the job, August 2020
  13. Task 13. Complete production reports, purchase orders, and material, tool, and equipment lists.Core taskTask 1408Rated by 83 people who do the job, August 2020
  14. Task 14. Coordinate and implement quality control objectives, activities, or procedures to resolve production problems, maximize product reliability, or minimize costs.Core taskTask 18608Rated by 84 people who do the job, August 2020
  15. Task 15. Implement methods and procedures for disposition of discrepant material and defective or damaged parts, and assess cost and responsibility.Core taskTask 1406Rated by 84 people who do the job, August 2020
  16. Task 16. Apply statistical methods and perform mathematical calculations to determine manufacturing processes, staff requirements, and production standards.Core taskTask 1395Rated by 83 people who do the job, August 2020
  17. Task 17. Study operations sequence, material flow, functional statements, organization charts, and project information to determine worker functions and responsibilities.Core taskTask 1404Rated by 83 people who do the job, August 2020
  18. Task 18. Formulate sampling procedures and designs and develop forms and instructions for recording, evaluating, and reporting quality and reliability data.Core taskTask 1402Rated by 84 people who do the job, August 2020
  19. Task 19. Regulate and alter workflow schedules according to established manufacturing sequences and lead times to expedite production operations.Supplemental taskTask 1410Rated by 83 people who do the job, August 2020
  20. Task 20. Schedule deliveries based on production forecasts, material substitutions, storage and handling facilities, and maintenance requirements.Supplemental taskTask 1409Rated by 83 people who do the job, August 2020

Where this comes from

Quoted from the U.S. Department of Labor, and credited. Nothing on this page is written by us.

How we copy and credit sources
  1. Published by
    O*NET 29.0, U.S. Department of LaborEmployment and Training Administration
  2. Classification
    Standard Occupational Classification 2018, 17-2112
  3. License
    CC BY 4.0Free to copy and reuse, with credit
  4. Changed by us
    Nothing.

More in Architecture & Engineering

58 other occupations in this family, each with its own page.

Use this record

Every task on this page is free to reuse, with credit to O*NET. The code and data behind the record are public.

Partner with us

Fund the next pass, contribute data, or build on the record. Tell us what you have in mind.

Partner with us