Terrazzo Workers and Finishers
Apply a mixture of cement, sand, pigment, or marble chips to floors, stairways, and cabinet fixtures to fashion durable and decorative surfaces.
- Tasks
- 26 tasks18 core, 8 supplemental
- Family
- Construction & ExtractionOne of its 65 occupations
- Code
- 47-2053.00SOC 2018: 47-2053
What the work is made of
18 core tasks and 8 supplemental, each quoted as published, with the survey it came from.
Core: central to the jobSupplemental: done by some, not all
- Task 1. Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.Core taskTask 9825Rated by 62 people who do the job, July 2015
- Task 2. Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.Core taskTask 9829Rated by 61 people who do the job, July 2015
- Task 3. Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.Core taskTask 9823Rated by 61 people who do the job, July 2015
- Task 4. Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.Core taskTask 9824Rated by 61 people who do the job, July 2015
- Task 5. Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.Core taskTask 9831Rated by 62 people who do the job, July 2015
- Task 6. Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.Core taskTask 9827Rated by 61 people who do the job, July 2015
- Task 7. Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.Core taskTask 9828Rated by 62 people who do the job, July 2015
- Task 8. Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.Core taskTask 9832Rated by 61 people who do the job, July 2015
- Task 9. Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.Core taskTask 9830Rated by 60 people who do the job, July 2015
- Task 10. Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.Core taskTask 9838Rated by 59 people who do the job, July 2015
- Task 11. Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.Core taskTask 9837Rated by 61 people who do the job, July 2015
- Task 12. Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.Core taskTask 9834Rated by 61 people who do the job, July 2015
- Task 13. Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.Core taskTask 9835Rated by 60 people who do the job, July 2015
- Task 14. Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.Core taskTask 9833Rated by 61 people who do the job, July 2015
- Task 15. Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.Core taskTask 9839Rated by 60 people who do the job, July 2015
- Task 16. Mold expansion joints and edges, using edging tools, jointers, or straightedges.Core taskTask 9826Rated by 61 people who do the job, July 2015
- Task 17. Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.Core taskTask 9841Rated by 61 people who do the job, July 2015
- Task 18. Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.Core taskTask 9840Rated by 62 people who do the job, July 2015
- Task 19. Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.Supplemental taskTask 9836Rated by 61 people who do the job, July 2015
- Task 20. Precast terrazzo blocks in wooden forms.Supplemental taskTask 9845Rated by 61 people who do the job, July 2015
- Task 21. Wet concrete surface and rub with stone to smooth surface and obtain specified finish.Supplemental taskTask 9848Rated by 61 people who do the job, July 2015
- Task 22. Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.Supplemental taskTask 9842Rated by 62 people who do the job, July 2015
- Task 23. Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.Supplemental taskTask 9846Rated by 61 people who do the job, July 2015
- Task 24. Produce rough concrete surface, using broom.Supplemental taskTask 9844Rated by 60 people who do the job, July 2015
- Task 25. Remove frames when the foundation is dry.Supplemental taskTask 9847Rated by 61 people who do the job, July 2015
- Task 26. Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.Supplemental taskTask 9843Rated by 61 people who do the job, July 2015
Where this comes from
Quoted from the U.S. Department of Labor, and credited. Nothing on this page is written by us.
How we copy and credit sources- Published byO*NET 29.0, U.S. Department of LaborEmployment and Training Administration
- ClassificationStandard Occupational Classification 2018, 47-2053
- LicenseCC BY 4.0Free to copy and reuse, with credit
- Changed by usNothing.
More in Construction & Extraction
64 other occupations in this family, each with its own page.
- Boilermakers17 tasks
- Brickmasons and Blockmasons14 tasks
- Carpenters29 tasks
- Carpet Installers16 tasks
- Cement Masons and Concrete Finishers26 tasks
- Construction and Building Inspectors19 tasks
- Construction and Related Workers, All OtherNo tasks listed
- Construction Laborers27 tasks
- Continuous Mining Machine Operators15 tasks
- Derrick Operators, Oil and Gas15 tasks
- Drywall and Ceiling Tile Installers26 tasks
- Earth Drillers, Except Oil and Gas29 tasks
- Electricians21 tasks
- Elevator and Escalator Installers and Repairers20 tasks
- Energy Auditors21 tasks
- Excavating and Loading Machine and Dragline Operators, Surface Mining16 tasks
- Explosives Workers, Ordnance Handling Experts, and Blasters27 tasks
- Extraction Workers, All OtherNo tasks listed
- Fence Erectors20 tasks
- First-Line Supervisors of Construction Trades and Extraction Workers15 tasks
- Floor Layers, Except Carpet, Wood, and Hard Tiles14 tasks
- Floor Sanders and Finishers7 tasks
- Glaziers27 tasks
- Hazardous Materials Removal Workers21 tasks
- Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters15 tasks
- Helpers--Carpenters18 tasks
- Helpers--Electricians25 tasks
- Helpers--Extraction Workers14 tasks
- Helpers--Painters, Paperhangers, Plasterers, and Stucco Masons11 tasks
- Helpers--Pipelayers, Plumbers, Pipefitters, and Steamfitters15 tasks
- Helpers--Roofers18 tasks
- Helpers, Construction Trades, All OtherNo tasks listed
- Highway Maintenance Workers19 tasks
- Insulation Workers, Floor, Ceiling, and Wall10 tasks
- Insulation Workers, Mechanical9 tasks
- Loading and Moving Machine Operators, Underground Mining25 tasks
- Operating Engineers and Other Construction Equipment Operators26 tasks
- Painters, Construction and Maintenance19 tasks
- Paperhangers20 tasks
- Paving, Surfacing, and Tamping Equipment Operators20 tasks
- Pile Driver Operators5 tasks
- Pipelayers14 tasks
- Plasterers and Stucco Masons15 tasks
- Plumbers, Pipefitters, and Steamfitters30 tasks
- Rail-Track Laying and Maintenance Equipment Operators26 tasks
- Reinforcing Iron and Rebar Workers7 tasks
- Rock Splitters, Quarry9 tasks
- Roof Bolters, Mining14 tasks
- Roofers27 tasks
- Rotary Drill Operators, Oil and Gas20 tasks
- Roustabouts, Oil and Gas13 tasks
- Segmental Pavers12 tasks
- Septic Tank Servicers and Sewer Pipe Cleaners22 tasks
- Service Unit Operators, Oil and Gas19 tasks
- Sheet Metal Workers19 tasks
- Solar Energy Installation Managers15 tasks
- Solar Photovoltaic Installers26 tasks
- Solar Thermal Installers and Technicians21 tasks
- Stonemasons17 tasks
- Structural Iron and Steel Workers19 tasks
- Tapers16 tasks
- Tile and Stone Setters25 tasks
- Underground Mining Machine Operators, All OtherNo tasks listed
- Weatherization Installers and Technicians20 tasks
Use this record
Every task on this page is free to reuse, with credit to O*NET. The code and data behind the record are public.
Partner with us
Fund the next pass, contribute data, or build on the record. Tell us what you have in mind.
Partner with us